news
News Center
Providing high-quality power to the world
Search productSearch post
news
Providing high-quality power to the world

Use a repeatable transformer winding resistance site test procedure for EPC handover. Record tap position, temperature, test current, stabilization...

Plan substation revenue metering handover with verified CT/VT ratios, register mapping, time conventions and end-to-end data evidence. Define utili...

Substation event record acceptance for EPC handover: verify COMTRADE files, device identity, retrieval paths, channel meaning and archive access. U...

Plan transformer cooling stage acceptance with fan-group checks, failure-state tests, clear feedback definitions and traceable EPC handover records.

Review substation earthing continuity acceptance with bond inspections, defined test points, instrument records and traceable EPC handover evidence.

Plan substation DC earth fault location acceptance with verified feeder identities, monitoring boundaries, alarm interfaces and traceable handover ...

Review substation cable gland acceptance through cable identity, complete gland selection, entry plates, sealing and bonding evidence. Build tracea...

Build a substation temporary modification register that connects approved test changes to baseline records, restoration checks and release evidence...

Review substation labeling acceptance: reconcile equipment identity, circuit references, warning signs and field evidence before EPC handover.

Review substation bolted connection records: verify torque instructions, tool traceability, witness marks and reassembly evidence before EPC handover.